 |
 |
 |
| This production control FA system covers overall process from "Production preparation", "Scheduling", and "Progress control" to "Stock control". Also included are such functions like "control of each equipment" including take-out robots and "QC support". |
Remote production monitoring is enabled through Internet. Further, by installing a camera at the plant, animation can be transmitted immediately. |
 |
 |
 |
 |
| Even in the case a plant has injection molding machines of several companies, our air-driven take-out robots or other brand's take-out robots, they can all be linked to the network for production monitoring. |
This system provides data with which you can carry out "QC activity" more effectively. |
 |
QC support function screen
This system sets person/equipment/material as objects of productivity analysis. Customers will set target figures for labor per person/molding machine/material (kg). Then they will compare actual production figures with target figures and analyze it. |
 |
 |
 |
 |
We added new functions that help customers improve quality and production ratio, and perform maintenance works.
|
The operation frame has been re-designed to create a user-friendly screen display.
|
 |
Mold maintenance screen
Using the take-out robot controller, customers can check the mold maintenance record before starting production. Also, attaching the image data of relevant molds allows customers to confirm the current status with more visual details and prevent false checking.
|
 |
All-function menu screen
Even an excellent control system cannot be widely used at plants if it is visually difficult to handle. We, therefore, re-designed the frame of NEW Y-MAPII screen. Further, function icon buttons and all-function menu screen favored for take-out robots have been adopted, which allows customers who are not used to operation to easily display the desired screen.
|
 |
Process check sheet screen
The take-out robot controller screen displays the check sheet used for the (random sampling) inspection of molded products immediately after the molding process.
|